Maslaktepe WPP Phase-I was commissioned in 2019 with an installed capacity of 23.4MWm/23.4MWe. With the completion of Phase II works in October 2022, the installed capacity reached 52.9MWm/51.525MWe. In Maslaktepe WPP, which has two ongoing phases, when all phases are completed, the installed capacity will be 82.4MWm/80.2MWe.
- Phase-III (17,7MW) is under construction and will be commissioned by June 2023
- Phase-IV (11,8MW) construction permit procedure is ongoing and will be commissioned after getting construction permit.
The annual electricity production of Maslaktepe WPP at final state will be 320.000 MWh.