MASLAKTEPE WPP project is in Bayramiç district of Çanakkale province. It has been in operation since 2019 with a capacity of 23.4 MW, and its capacity reached to 52.9MWm/51.525MWe with the turbines added in 2022. The ongoing additional turbine installation works of the project, which will reach a total installed capacity of 82.4 MW with the capacity increase, are planned to be completed in 2023.