BOREAS I Enez WPP project, one of the first wind power plants in Turkey, has been in operation since 2010 in the Enez district of Edirne province with an installed capacity of 21.6 MW. The ongoing additional turbine installation works of the project, which will reach a total installed capacity of 30.9 MW with the capacity increase, are planned to be completed in 2023.