
A SPP with an installed capacity of 700 kWp/600kWe will be installed on the roof of the Ener Süt Factory building located in İzmir Tire Organized Industrial Site. Thanks to this investment, a significant portion of the factory’s own consumption will be met from renewable energy. The project is at the construction permit stage, and upon the completion of the permit processes, the installation procedures will be completed, and the facility will be commissioned.